An Introduction to Electric Charging Stations

Types of Chargers 

  • Level 1 

    • 120 Volt AC

    • Adds 2-5 miles of range per hour

    • Primarily home chargers, workplace

  • Level 2 

    • 240 Volt AC 

    • Adds 10-20 miles of range per hour

    • Grocery stores, retail parking lots, public parking garages, offices, malls    

  • DC Fast 

    • 480 Volt DC or 208 Volt AC

    • Converts high voltage AC (alternating current) power to DC (direct current) power to store directly in the electric battery

    • Adds 60-80 miles of range per 20 minutes

    • Heavy traffic corridors (highways), gas stations, larger businesses 

Costs

  • Purchase Costs per unit 

    • Level 1 

    • Level 2

      • In 2015, the U.S. Department of Energy listed the range as $400-$6,500 

        • Higher power, public chargers are often above $3,000

    • Level 3 

      • In 2015, the U.S. Department of Energy listed the range as $10,000-$40,000 

  • Installment Costs

    • Charging station hosts often have an electrical contractor complete a site evaluation to best determine the specific location for the station

    • During the installation process, the contractor:

      • Purchases the station

      • Installs, upgrades or connects the station to an electric service

      • Installs the charging station

    • Installation costs increase with more complex installation including 

      • Trenching to connect the station to an electrical panel

      • Installing a new electrical service

      • Upgrading the current electrical service

Installment Cost Ranges and Averages

EV Charging Station Type

Installment Cost Range

Average Installment Cost

Level 1

$0-3,000

N/A

Level 2

$600-12,700

$3,000

DC Fast

$4,000-51,000

$21,000

Source: U.S. Department of Energy

Operation and Maintenance Costs 

  • Operation Costs

    • Costs for the electricity to charge vehicles 

      • Amount will vary depending on

        • The electric utility’s specific rate

        • The volume of vehicles

        • Time spent charging by vehicles at the station

      • Using Level 2 or DC chargers could lead to higher demands on the electric facility, leading to additional demand charges

        • Will vary based on location and charger type

    • If the charging stations are networked online, hosts will have to pay for the network’s communications and office support

      • Fees will range from $100-900 annually

  • Capital Costs 

    • Potential warranties for hardware or labor

    • Costs to purchase or lease land or parking spaces

  • Maintenance Costs

    • Basic units often do not require regular maintenance as owners often replace the damaged component 

    • More complex units may require periodic maintenance due to the increased amount of components that could fault 

    • Here are examples of maintenance costs for each level of charging station

      • Level 1

        • Replacement of an electrical outlet ($1-$40 plus electrician fee)

        • Minimal maintenance

      • Level 2 

        • Often can replace individual malfunctioning components alone

        • Minimal maintenance

      • DC Fast 

        • Require periodic maintenance due to complex components including cooling systems and filters

        • Highest maintenance costs 

Incentives *

  • Clean Fleet EV Incentive Program

    • $1,500 towards the purchase of one fleet level 2 charging station (not available to the public)

    • $2,000 towards the purchase of a public level 2 charging station

      • Depending on the size of the municipality, your town may be eligible for up to four level 2 charging stations

      • To apply, must have purchased a dual port charger with the ability to capture data (networked charger)

    • $4,000 toward the purchase of an eligible battery electric vehicle

    • Rolling basis application, form to apply in the link above 

      • Applications can be found here

  • The application deadline is 5 p.m. on May 1, 2022,unless funds are exhausted earlier.

  • It Pay$ to Plug In

    • Level 1 and Level 2 charging stations exclusively public

      • Up to $750 for each level 1 charging port 

        • Minimum of 5 charging ports

      • Up to $4,000 for each level 2 charging port

        • 2-20 charging ports per location

      • Money can be used towards purchase, installation and/or other fees

      • Rolling basis application 

        • Follow these application steps

    • Exclusively public DC Fast chargers, especially for prioritized NJ corridors

      • Up to $200,000 in reimbursement 

      • Chargers must have 2 ports at minimum

      • Must be located within one mile driving distance from an exit or intersection along designated major travel corridors 

      • Currently closed for applications since July 22, 2020, but is likely to open again soon

        • Follow these application steps when reopened

    • More information on It Pay$ to Plug In can be found here and here

*The Clean Fleet EV Program and It Pay$ to Plug In cannot be used for the same charger

Become A Leader of Electric Charging

EV Charging Access and Infrastructure